Now a days in most drilling operations a huge amount of money and finance is spent on drilling problems and hazards like stuck pipe, lost circulation, formation fracture and mud costs. These drilling problems result in non-productive time (NPT) and extra rig costs. These problems can be solved by controlling annular pressure profile mostly in the areas where fracture pressure and pore pressure gradient is too close, which means drilling window...
CHF 47.50